Our Projects
Marks has and continues to work within budgets ranging from $5,000 to $3,000,000. Our project time constraints can accommodate completion in one day to six months based on the client’s desired timeline and budget. We continually serve our wide range of clients based on their needs of project size, budget, and ideal completion dates.
Construction of 2,300 LF of ADA trail, including the installation of an 85 LF pre-stress bridge and 800 LF of stream restoration along Alder Run.
Project Cost: $1.1M
Medina Sanitary Engineer – Rocky River Streambank Stabilization
Stabilization of 1,000 LF along the Rocky River in Valley City, Ohio. Scope included 15,000 tons of limestone riprap, 8,000 tons of 304 limestone/embankment, sanitary sewer encasement, and site restoration.
Project Cost: $2.2M
Gerber Property Stream and Wetland Restoration
Clearing and grubbing, 220,000 C.Y. excavation and embankment to form a new stream channel and floodplain, 154,000 C.Y. clay hauling/stockpiling, aggregate access drive and parking lot, erosion control, seeding, mulching, planting of trees/shrubs, and signage.
Project Cost: $3.8M
Medina County Park District – Litchfield Wetlands Nature Preserve
This project involved over 40,000 C.Y. of excavation and embankment to create 80+ acres of wetland. Work included the construction of approximately 1.7 miles of aggregate walking trail, a 30-stall parking lot, precast-vaulted restroom, boardwalk, and various observation amenities.
Project Cost: $1.1M
City of Twinsburg – Bank Stabilization & Sanitary Sewer
Stabilization of 300 LF of streambank along Tinker's Creek utilizing brush layering and limestone riprap. The project also included 250 LF of 18" live sanitary sewer placement.
Project Cost: $300,000
Northeast Ohio Regional Sewer District – Ridge Road Repair & Rocky River Tributary Stabilization & Realignment
Relocation of 323 LF of an unnamed tributary of the East Branch Rocky River, featuring riffle structures, mini-vane, and wood toe with live branch layering. Work included an energy dissipation basin in the relocated channel, demolition of existing concrete revetment, and reconstruction of the roadway and embankment.
Project Cost: $430,000
Medina Parks – Chippewa Lake Restoration
Project consisted of 14,000 C.Y. of excavation and embankment to increase floodplain storage and create nearly 4,000 LF of linear wetland. Also included 1,500 LF of paved trail and 500 LF of pre-fabricated boardwalk.
Project Cost: $700,000
City of Green – Ariss Park
Included 6,000 C.Y. of excavation and embankment to construct five soccer/football fields. Scope covered all seeding, restoration, storm sewer with two bio-retention cells, and 9,000 SF of concrete walk.
Contract Cost: $400,000
Cleveland Metroparks – Johnsons Creek Restoration
Restoration along Johnsons Creek to promote fish passage and encourage floodplain connectivity.
Project Cost: $400,000
Valued Clients
- Chagrin River Watershed Partners
- City of Brunswick
- City of Hudson
- City of Medina
- City of Northwood
- City of Seven Hills
- Cleveland Metroparks
- Geauga Park District
- Lorain County Engineers
- Medina County Park District
- Metroparks Toledo
- Northeast Ohio Regional Sewer District (NEORSD)
- Summit Metro Parks
- Summit County Engineers
- The Nature Conservancy
- Tinker’s Creek Watershed Partners
- Western Reserve Land Conservancy
- Lake Metroparks
- Stream and Wetlands Foundation
- West Creek Conservancy
-
Ohio Department of Natural Resources (ODNR)
-
Lorain County Storm Water Development
- And many more…
CONTACT US
Mark’s Construction
5855 Center Rd
Valley City, OH 44280
330-273-3121